When Many Agents Are Worse Than One

Measure verified completion, duplication, conflict and total spend across budget-matched team sizes.

Four investigators finish a maintenance task with an impressive collection of notes. One found the retry configuration. Another proposed a patch. A third reviewed the tests. The fourth reconciled the reports. Together they consumed the entire budget and returned a plausible solution. A single investigator, given the same total resources, might have read the implementation, written one regression test and finished earlier. The team has demonstrated activity. Whether it has demonstrated an advantage is a comparison the activity itself cannot answer.

Chapter 20 defined how parallel work can be merged without converting votes into evidence. This chapter asks a preceding decision question: when should the harness create parallel model work at all? Team size is a policy choice with opportunity costs. The correct answer can be one agent, a bounded search over independent attempts, a few specialists, a deterministic tool, or a human escalation. None deserves privileged status because it sounds more intelligent.

Evidence status. Provisional technical draft. Team-selection rules, decomposition diagnostics and E24 are PROPOSED. Worked budgets and counts are hypothetical. MAST is DOCUMENTED prior research through the pinned R03/Chapter 20 record, not a local replication. Project 08 has not started; no team runtime is implemented here. Project 01 remains REJECTED. EXPERIMENT PENDING.

24.1 Parallelism spends depth to buy coverage

At a fixed budget, extra agents cannot create extra reasoning capacity without consuming a share somewhere else. Divide a task budget among four workers and each receives less depth. Reserve time and tokens for merging and the workers receive less again. This is the conservation rule of Chapters 17 and 19 applied to a design decision rather than a safety check.

The simple baseline is one admitted agent episode with the tools and evidence needed for the task, followed by independent evaluation. Its advantages are concrete: one context, no message arbitration, no duplicated investigation unless the agent chooses it, and a clear artifact owner. Its weaknesses are equally concrete: limited exploration, one mistaken framing and a potentially long critical path.

A team can help when useful work separates. Two modules may need independent investigation before an integration decision. Two alternative proof attempts may expose different assumptions. A verifier may examine a finished artifact without inheriting the author’s explanation. These are different forms of parallel work, and they should not be bundled into one treatment called multi-agent reasoning.

Ask what resource is supposed to improve. Parallel workers can reduce elapsed latency even if total work increases. Several samples can improve the chance of finding a good candidate without sharing information. Specialization can reduce context load, but only if the context needed by each role is actually smaller. A claim about one endpoint cannot silently stand in for improvement on the others.

24.2 Four reasons teams lose

Fragmented evidence is the first. A patch author sees a configuration excerpt, a reviewer sees a prose summary, and nobody sees that the code never reads the setting. The team has distributed its blind spot. Chapter 20’s shared evidence store helps only if consumers resolve actual receipts, not each other’s confident paraphrases.

Coordination cost is the second. Assignments, clarifications, repeated context, conflict resolution and final verification are real work. Count them at the same accounting boundary as model and tool calls. Calling a coordinator a free supervisor does not make its model requests free. Deterministic host scheduling may be inexpensive, but its implementation and operational complexity still belong in the engineering account.

Correlated error is the third. Separate sessions of one model can share a mistaken premise. Different models can share training sources or an ambiguous prompt. A panel that votes on the same misleading excerpt does not independently inspect the missing implementation. Independence must be described by model, data, procedure and evaluator relations, as in Chapter 21, rather than inferred from the number of names in a log.

Ownership diffusion is the fourth. Each child assumes another checked the permanent-failure case. The coordinator assumes the reviewer did. The reviewer checked only syntax. The output says verified, but no component owns the missing property. Typed deliverables and per-property acceptance responsibilities are more useful than generic role prompts. Every claimed check needs an owner, evidence and a failure exit.

These are proposed explanatory mechanisms, not measured prevalence rates. MAST’s published failure taxonomy motivates controls and hypotheses; it does not establish that this Pi harness will fail for the same reasons or with the same frequency. A good local study must observe which mechanism is operating instead of borrowing that conclusion.

24.3 A decomposition contract precedes a team

Before creating children, the host needs a decomposition proposal it can reject. The proposal names the task partition, deliverables, shared preconditions, dependencies and integration owner. It also states why parallelism is expected to help: independent evidence coverage, alternative candidate search or lower elapsed time. A model may propose this structure; the host decides whether it fits the admitted task and budget.

For a repository maintenance task, plausible roles are investigating the affected call path and independently deriving regression cases. They can read immutable snapshots without writing conflicting patches. A less plausible decomposition asks four agents to edit the same small function and then hopes merging will recover the best ideas. That is candidate search with merge risk, not naturally separable implementation work.

Each child receives Chapter 19’s seven-element delegation contract. Assignments must identify the subject of each claim and its search scope. They must say whether absence conclusions require complete finite coverage or a bounded search report. They must define what unresolved disagreement returns: REVIEW, a request for another bounded check, or a stop. A child cannot silently enlarge the investigation to make its own report look complete.

The integration owner retains responsibility for the whole outcome. Two passing sub-artifacts do not imply a passing combined artifact. Conversely, a child can fail a subtask while supplying useful negative evidence. Preserve that result without turning partial usefulness into joint accepted completion. This is the two-dimensional evaluation model at the coordination boundary.

24.4 Budget fairness includes the verifier

Carry forward Chapter 20’s explicitly hypothetical allocation: total 120,000 billed-token units, a fixed 20,000 reserve, and 100,000 for generation. A1 receives 100,000; A2 receives 50,000 each; A4 receives 25,000 each. Best-of-four also receives four attempts of 25,000, with selection and final validation charged inside the same reserve. Unused shares do not migrate between attempts in this registered design.

The arithmetic is simple because the difficult choice is made before the run. The reserve is calibrated on development only and frozen. If a four-person team needs more merging than fits, it stops incomplete; it does not acquire extra budget because coordination turned out hard. That result is evidence about this allocation and task class. It is not proof that all team designs are impossible.

Token ceilings do not equal monetary ceilings when models, cache tariffs or external services differ. Team studies using several model families need a dated currency ledger and a separate resource vector for calls, tool work and time. Report aggregate work time separately from elapsed latency. Four workers running for ten seconds consume forty worker-seconds but may finish in roughly ten elapsed seconds plus overhead. Neither metric should be relabelled as the other.

Candidate verification can itself be a powerful search mechanism. If the team gets a semantic judge and the single agent gets only a parser, the comparison bundles coordination with verification. Give controls the same candidate-selection procedure and charge it. Keep the final assessment oracle separate and unavailable for iterative search. Register how many candidate-check attempts each arm may request, not just how many answers it eventually presents.

24.5 Worked example: coverage without coordination theatre

Consider a synthetic package containing twelve small files. The task is to fix a transient-retry defect and preserve permanent-error behaviour. Four files are relevant. A source catalogue identifies names but does not reveal which implementation enforces the configuration. The example is a design walk-through, not an executed study.

The host proposes two investigations. Child I must locate the executable retry path and return cited claims with complete scope. Child T must derive test obligations from the public contract without seeing I’s conclusion. Neither has edit authority. The parent receives both reports, checks citations and constructs one patch proposal under normal gates.

Now inject a misleading comment saying permanent errors are retried. Child I follows the implementation and rejects the comment. Child T extracts both transient and permanent obligations from the contract. Their outputs disagree with the comment for different recorded reasons. That is potentially useful diversity. If instead both children receive the same summary saying all errors are transient, their agreement tells us little about the omitted case.

The comparison includes A1, which gets the catalogue and full generation share; A2 with the two scopes; A4 with four smaller scopes; and BoN4, which repeats the whole task with separate contexts and selects under the same candidate checker. All begin from the identical snapshot. Suppose, purely to illustrate accounting, two A2 children emit 18 and 14 tool results, of which six repeat the same admitted source operation. The duplication fraction is 6/32 = 18.75% under that registered definition. It is not automatically waste: a repeated independent check may be useful.

The verdict requires more than counting completed child reports. If A2 finds a correct patch but the parent applies it against a stale base, task truth about the proposed patch may be retained while execution is rejected. If A4 never produces a final patch within budget, child successes remain observations but the registered whole-task delivery criterion is not satisfied. If A1 passes, that result must not be dismissed because its trace looks less elaborate.

24.6 Measure the cost of communication without assuming silence is best

Communication can prevent duplicated searches and propagate a crucial finding. It can also spread an unsupported premise. The relevant variable is not simply whether agents talk. It is what kind of message crosses which boundary and what a recipient may infer from it.

A useful baseline shares no intermediate beliefs, only immutable source receipts admitted by the host. A richer arm permits typed claims with citations after independent support checks. An unrestricted discussion arm would change more: messages, role relationships, context volume and possibly the final decision rule. That may be a legitimate system-level comparison, but it cannot isolate the effect of one evidence-sharing hook.

Log messages as proposed claims, observed evidence or control decisions. Do not normalize all three into an undifferentiated team history. A control decision such as cancelling a child belongs to the host ledger. A model’s suggestion to cancel is a proposal. A receipt showing an external effect completed belongs to the broker/runner evidence path. This distinction prevents communication from becoming unauthorized control.

Count input retransmission as well as generated message length. A short finding copied into every subsequent request may create more billed input than its authoring cost suggests. Chapter 7’s context accounting applies across agents as well as across turns. A fixed total history allowance and recorded rendering make the communication treatment reviewable, while still leaving its usefulness an empirical question.

A break-even calculation makes the hypothesis concrete

Let the single-agent arm use generation cost G and verification cost V. A team introduces coordination cost H and may reduce the number of failed final artifacts requiring repair. Ignoring the common costs only for this explanatory comparison, the team is economically preferable when its additional overhead is outweighed by a measurable reduction in expected failure cost. That inequality is a decision model; its parameters are not facts until measured for the target task distribution.

With hypothetical values, suppose a failed maintenance attempt costs 30 additional work units to diagnose and redo. If coordination adds 6 work units per attempt, it must reduce the failure probability by more than 6/30 = 0.20 to break even on that simplified account. A reduction from 0.40 to 0.30 saves 3 units, below the 6-unit overhead. A reduction from 0.40 to 0.15 saves 7.5 units, above it. These numbers do not price external harm, latency or human review, which would need separate terms.

This is why a small success-rate gain is not automatically a better economic choice, and why a latency-sensitive service may still choose parallelism with no spending advantage. State the objective and constraints before looking at results. A registered cost-quality frontier is more informative than announcing that the team solved one extra task while omitting its coordination bill.

Diagnose a loss at the boundary that produced it

If a team loses, preserve enough intermediate evidence to distinguish failure mechanisms. No investigator finding the relevant locus is a coverage failure. An investigator finding it but omitting it from the deliverable is a communication or schema failure. A valid cited finding being discarded at merge is an arbitration failure. A correct merge followed by a stale write is an execution failure. A correct artifact marked wrong by an unsuitable oracle is an evaluation failure.

These labels are hypotheses about causes until the recorded transitions and independent checks support them. A model’s retrospective explanation does not establish why another agent failed. Re-execution or a controlled ablation may be needed: hold the finding fixed and change the merger, or hold the merger fixed and supply complete evidence. Register such follow-ups as exploratory when prompted by confirmation failures. Do not present the repaired system’s result on those same tasks as a fresh confirmation of the original hypothesis.

The same discipline applies to a team win. If the coordinator secretly received a larger context or a stronger verifier, that is a bundled system difference. It may be useful, but the result cannot identify coordination as the unique cause. A factorial extension can separate those contributions if its combinations and contrasts are designed before the new confirmation set is opened.

24.7 E24: when does the team fail to justify itself?

The research question is whether team coordination improves verified completion or elapsed latency enough to justify its full cost over the strongest simple baseline. The primary hypothesis is that A2 improves verified completion over BoN4 on predeclared separable tasks at a common cost target. The plausible alternative is no demonstrated gain, or harm, because coordination and reduced depth outweigh coverage. Non-separable tasks are a separately registered stratum, not examples removed afterward.

Arms are A1, A2, A4 and BoN4 under the Chapter 20 budget rule. Add evidence-only versus typed-claim communication as a registered factorial extension if resources permit; otherwise defer it rather than run an underpowered menu of variants. Independent variables are arm and declared task stratum. Primary dependent variable is task PASS with execution ACCEPTED. Secondary endpoints are separate verdict dimensions, elapsed latency, aggregate work, total monetary cost, conflict rate, duplicate operation fraction and unsupported claims accepted by the merger.

The fixture is a versioned set of synthetic or appropriately licensed maintenance repositories grouped by shared implementation and answer dependencies. Freeze separability labels before confirmation using structural criteria, such as independent modules and a declared join, not whichever tasks teams happened to win. The grouping/custodian method from Chapters 22–23 protects development and final confirmation throughout.

Register a separability labeller protocol independent of arm developers: two blinded labelers apply the same structural rubric before confirmation, disagreements go to a named independent adjudicator, and raw agreement plus unweighted nominal agreement statistics and their acceptance threshold are frozen. Unresolved labels follow a predeclared quarantine/unknown stratum rule, never whichever label favours the observed team result.

Reserve adequacy is a development-only qualification: register the maximum acceptable fraction of attempts ending INCOMPLETE specifically because the coordination/verification reserve is exhausted, its denominator and required precision/minimum coverage for every arm. If the fixed reserve fails, revise allocation and study identity before confirmation or report the design unqualified. Do not retune R from held-out outcomes or confuse a known under-reserve condition with evidence against task separability.

Use independent task/repository groups as the analysis unit. Repeated trials estimate within-group variation. Register paired cluster-aware intervals, sample size, repetitions, practical benefit margin and any secondary multiplicity adjustment before unsealing. Calibrate reserve adequacy, task labels and judge thresholds on development only. Retain every attempted arm and infrastructure refusal under frozen rules.

No numerical superiority result is asserted here. Support requires the registered primary interval to meet the benefit criterion at the matched cost target without violating required safety invariants. A wide interval is inconclusive. A precise interval inside a registered equivalence margin can support practical equivalence. If BoN4 wins, the evidence favours search over coordination for this setting, not a universal statement about teams. If A1 wins, keep it as the default rather than invent a weaker baseline. EXPERIMENT PENDING.

Operational duplication uses a registered key over tool/schema identity, canonical arguments, admitted source/fixture digest, range and relevant state revision. Repeated validation against changed state is not the same operation; repeated independent checks can be intentional and still counted as repeated work, not automatically waste. Freeze this definition before counting results.

Cancellation qualification registers cooperative-stop/drain deadlines and cleanup resource reserves in the common ledger. Charge cancelled-attempt spend, retain unknown usage holds and deny further exposed admissions until reconciled (Chapter 17). Unconfirmed cleanup is a refusal/escalation, not a promise of bounded physical termination or free losing attempts.

24.8 Safety predicates and team performance need different gates

Some requirements admit zero tolerance in a deterministic qualification catalogue: no child obtains an ungranted effect, no duplicate terminal message releases a reservation twice, no stale edit crosses its precondition, and no unconfirmed child is reported as safely stopped. One counterexample fails that stated predicate. A statistical completion gain cannot compensate for violating an authority invariant.

Semantic arbitration is different. A model judge can miss a subtle contradiction even with a well-formed evidence contract. Its measured error rate needs a denominator, uncertainty and a predeclared acceptable threshold. If that threshold cannot be qualified, route affected cases to deterministic checks or human review and count the extra cost. Do not describe a fallible semantic judge as a deterministic gate merely because the surrounding service returns a boolean.

The team also needs cancellation semantics. Stop the subtree’s new admissions, revoke future broker use and reconcile running requests and effects. A parent accepting the first good candidate may still owe the cost and cleanup of three cancelled alternatives. Racing candidates does not make losing attempts free, and a provider timeout does not turn their unknown consumption into zero.

These gates are implementation specifications for the existing host, broker, supervisor and evaluator boundaries. They do not require a new team service for every role. The simplest host schedule with a bounded join may suffice. Add distribution only when a measured concurrency or ownership requirement justifies its failure modes.

24.9 Alternatives and a stop rule for architectural enthusiasm

Before adding agents, consider a deterministic search tool, a better context projection, one additional verification pass or a human question. If the main failure is that the implementation excerpt was missing, another agent receiving the same deficient context is a weak remedy. If the main failure is stale effect authority, better coordination prose cannot replace a broker precondition.

Host-orchestrated decomposition offers a reviewable middle ground: scopes and joins are fixed by code, while Pi performs reasoning inside each bounded episode. Agent-proposed decomposition is more flexible but adds an untrusted admission proposal. Test its incremental value rather than assuming flexibility is worth its governance and observation cost.

A practical proposed stop rule is to retain the simplest qualified arm until a frozen comparison supports a meaningful advantage for a richer one. Negative evidence belongs in the decision record: which task classes, model identities, costs and uncertainty limited the result. It need not become a universal prohibition on teams. Equally, a team’s occasional spectacular solution does not establish a better default policy.

Team selection should not adapt on the test

A tempting extension observes the first few tasks and chooses A1, A2 or A4 for the remainder. This can be a legitimate adaptive routing policy, but it is a different treatment from comparing fixed team sizes. Its selection overhead, available features and fallback rules must be frozen and evaluated as a whole. It cannot use the task’s final oracle label to decide retrospectively which arm should have handled it.

For the initial comparison, keep allocation fixed within an arm. A child that finishes early cannot donate unspent tokens to a sibling under the chosen rule, and a coordinator cannot spawn a fifth investigator after seeing a disappointing draft. A later study may register work-conserving reallocation with atomic ledger reservations. Its fairness comparison must give the single-agent/search baselines a comparably explicit continuation policy, not reserve flexibility for the team alone.

A useful release decision records the task domain where a team is eligible, the versioned allocation, verifier and decomposition policy, and the evidence supporting that choice. Outside that domain the fallback is the independently qualified simple arm, not a remembered high-scoring team trace. This connects team selection to the experience standing rules: a favourable past result is advice within scope, not a universal deployment mandate.

24.10 What must exist before the recommendation can be operational

The shared ledger, scoped delegation, protected evidence store and combined verification of Chapters 19–20 are prerequisites, not delivered software. Project 08’s study has not run. No chapter can infer a qualified team runtime from the existence of Pi sessions or from a published framework’s capabilities. Pinned Pi behavior under concurrent cancellation and resource contention remains a test obligation.

The multi-agent coordination strand therefore has three deliverables: an engineering design with explicit joins and ownership; an implementation specification with refusal and reconciliation tests; and an experimental qualification comparing teams with A1 and BoN4 at honest total cost. A working demonstration satisfies only part of the middle deliverable. It cannot establish the third by showing that several agents exchanged messages and eventually returned an answer.

Once team size becomes a selectable, evidence-backed option, it joins other choices: context policy, repair limit, verification path and later model route. The next question is who may choose among them and how that choice can improve without controlling its own authority. Chapter 25 places the existing Executable Cognitive Kernel above the agent loop, as a source of bounded policy advice rather than a replacement for Pi.